We have a shower! It’s not complete — missing tile inside the nook, glass doors, and a few other things — but it’s water-tight, has a shower curtain on a temporary rod, and all the plumbing is done. So we can use this now instead of the temporary one lined with plastic sheeting. So much nicer!
Month: June 2026
Getting there
The big thing today is that electrical is done, including a vanity fixture for the green bathroom. Other things you’ll note in this photo include the antique medicine cabinet, heated-floor thermostat, our funky subway wall tiles installed and grouted, and the accent strip installed but not yet grouted. And two mistakes: one outlet was roughed in too low, and our contractor used pencil liner atop the accent strip instead of the intended full-size bullnose tiles.