{"id":48,"date":"2012-04-14T12:15:26","date_gmt":"2012-04-14T12:15:26","guid":{"rendered":"http:\/\/blog.parkercat.org\/remodel\/2012\/04\/14\/week_2_report\/"},"modified":"2012-04-14T12:15:26","modified_gmt":"2012-04-14T12:15:26","slug":"week_2_report","status":"publish","type":"post","link":"https:\/\/blog.parkercat.org\/remodel\/2012\/04\/14\/week_2_report\/","title":{"rendered":"Week 2 report"},"content":{"rendered":"<p>Today marks the conclusion of the second week of the kitchen project.&nbsp; The brief status is that they&#8217;re just about done ripping out old stuff, the structural work on the old house is done, and plumbing is about 2\/3 roughed in.&nbsp; Read on for more details.<\/p>\n<p>This week Michael (the GC\/carpenter) installed the support beam as I&#8217;ve already posted about, and restructured the northeast wall to correct where it had been compromised by a previous generation of plumbers.&nbsp; He&#8217;s using 2&#215;6 framing in this wall, which will give us more insulation and will push things out into the room just enough that we won&#8217;t need to move a heating pipe. He also re-headered the two windows using modern methods.&nbsp; He alsp puzzled out a route for the range hood vent, since the most direct location would be straight through the post holding up the support beam.<\/p>\n<p>Michael is on vacation next week, so he cleared the way for both plumbing and electrical to finish their rough-ins in his absence. The plumbers made excellent progress this week: they ripped out the old radiators and structure-damaging sink drain\/vent, then finished the supply, drain, and vent for both sinks. Next week they need to rough in for the new radiator and kickspace heaters, and run a cold water line for the fridge.<\/p>\n<p>I met with the electrician yesterday to go over the lighting and electrical plan.&nbsp; The current plan is for 6&#8243; LED recessed lighting for general illumination, LED or fluorescent under-cabinet lights for task lighting, and pendant lighting in 4 separate locations. In addition there&#8217;s a dizzying array of outlets and switches required by code, appliances, and best practices.&nbsp; I was much relieved when, touring the kitchen, the electrician and I seemed to really be on the same page in terms of what makes sense.<\/p>\n<p>In fact, so far I am impressed with the work and just plain common sense of everyone we&#8217;re working with on this project.&nbsp; Being able to trust the tradesmen who are doing this work goes a long way toward reducing my stress level.<\/p>\n<p>The one area that is still a source of stress is that the planning for the 3-season room portion of this project is proceeding at a glacial pace. Given that we first settled on this contractor in November, the fact that we don&#8217;t have a permit for this yet is maddening.&nbsp; But we did receive the final plan in the mail yesterday, so I guess that will make progress soon enough.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Today marks the conclusion of the second week of the kitchen project.&nbsp; The brief status is that they&#8217;re just about done ripping out old stuff, the structural work on the&#8230; <a class=\"read-more-button\" href=\"https:\/\/blog.parkercat.org\/remodel\/2012\/04\/14\/week_2_report\/\">Read more &gt;<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_crdt_document":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-48","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/blog.parkercat.org\/remodel\/wp-json\/wp\/v2\/posts\/48","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blog.parkercat.org\/remodel\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blog.parkercat.org\/remodel\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blog.parkercat.org\/remodel\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/blog.parkercat.org\/remodel\/wp-json\/wp\/v2\/comments?post=48"}],"version-history":[{"count":0,"href":"https:\/\/blog.parkercat.org\/remodel\/wp-json\/wp\/v2\/posts\/48\/revisions"}],"wp:attachment":[{"href":"https:\/\/blog.parkercat.org\/remodel\/wp-json\/wp\/v2\/media?parent=48"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blog.parkercat.org\/remodel\/wp-json\/wp\/v2\/categories?post=48"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blog.parkercat.org\/remodel\/wp-json\/wp\/v2\/tags?post=48"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}