{"id":69,"date":"2012-05-19T21:45:55","date_gmt":"2012-05-19T21:45:55","guid":{"rendered":"http:\/\/blog.parkercat.org\/remodel\/2012\/05\/19\/week_7_report\/"},"modified":"2012-05-19T21:45:55","modified_gmt":"2012-05-19T21:45:55","slug":"week_7_report","status":"publish","type":"post","link":"http:\/\/blog.parkercat.org\/remodel\/2012\/05\/19\/week_7_report\/","title":{"rendered":"Week 7 report"},"content":{"rendered":"<p>Major excitement this week!<\/p>\n<p>First event&#8230; we passed framing inspection, clearing the way for blueboard on Wednesday and skim-coat plaster on Thursday.&nbsp; The weather has been so nice for the past few days that the plaster dried out nicely, and we were able to paint today.&nbsp; I started around 9 this morning with primer.&nbsp; Lis left work early to come home around 3:30.&nbsp; We finished up around 7:30 pm.&nbsp; You can see the results in the <a href=\"http:\/\/gallery.parkercat.org\/v\/Kitchen\/Timelapse\/\">time-lapse gallery<\/a> but I&#8217;ll post it here as well.<br \/><a href=\"http:\/\/www.parkercat.org\/remodel\/DCL_0652.jpg\"><img loading=\"lazy\" decoding=\"async\" alt=\"DCL_0652.jpg\" src=\"http:\/\/www.parkercat.org\/remodel\/assets_c\/2012\/05\/DCL_0652-thumb-500x332-5892.jpg\" class=\"mt-image-none\" height=\"332\" width=\"500\" \/><\/a> <\/p>\n<div><\/div>\n<div>The spots that are still primer-white we intentionally didn&#8217;t paint, becuase they&#8217;ll have cabinets in front of them and we didn&#8217;t want to waste the effort.&nbsp; The yellow is a nice sunny color and we think it will look very nice with the other elements of the kitchen. The reddish color here is browner in person. It&#8217;s a nice complement to the yellow, adding some depth and delineating the more peripheral aspects of the room (eat-in table, mail sorter, charging station, etc.).&nbsp; Both colors need a second coat, which we plan to do in the morning.&nbsp; We wanted to get the bulk of the painting done before the cabinets and the floor go in, so we don&#8217;t need to be as careful about drips or cutting-in against brand new cabinets. In preparation for today&#8217;s work, I also installed the in-ceiling speakers: appropriate music helped the task quite a bit.<\/p>\n<p>Second event&#8230; we have the permit for the sunroom portion of the project.&nbsp; We expect at least some progress toward new footings this coming week, with major framing to commence the week of Memorial Day.<\/p>\n<p>Third event&#8230; the cabinets were delivered this morning.&nbsp; They&#8217;re camping out in our garage this coming week while the flooring goes in, and are expected to be installed the week of Memorial Day.&nbsp; Here they all are, taking up our entire garage.<br \/><a href=\"http:\/\/www.parkercat.org\/remodel\/DCL_0649.jpg\"><img loading=\"lazy\" decoding=\"async\" alt=\"DCL_0649.jpg\" src=\"http:\/\/www.parkercat.org\/remodel\/assets_c\/2012\/05\/DCL_0649-thumb-500x332-5894.jpg\" class=\"mt-image-none\" height=\"332\" width=\"500\" \/><\/a><\/p>\n<p>And here&#8217;s the custom mail sorter we had made.&nbsp; The shelves on the right-hand side are adjustable, stacked together as you see here for shipping; in the final configuration we anticipate having 6 slots on the right.<br \/><a href=\"http:\/\/www.parkercat.org\/remodel\/DCL_0648.jpg\"><img loading=\"lazy\" decoding=\"async\" alt=\"DCL_0648.jpg\" src=\"http:\/\/www.parkercat.org\/remodel\/assets_c\/2012\/05\/DCL_0648-thumb-500x332-5896.jpg\" class=\"mt-image-none\" height=\"332\" width=\"500\" \/><\/a><\/p>\n<p>See my Project 365 entry <a href=\"http:\/\/www.parkercat.org\/doug_project_365\/2012\/05\/cabinet.html\">for today<\/a> for another representative cabinet.<\/div>\n<div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Major excitement this week! First event&#8230; we passed framing inspection, clearing the way for blueboard on Wednesday and skim-coat plaster on Thursday.&nbsp; The weather has been so nice for the&#8230; <a class=\"read-more-button\" href=\"http:\/\/blog.parkercat.org\/remodel\/2012\/05\/19\/week_7_report\/\">Read more &gt;<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_crdt_document":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-69","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"http:\/\/blog.parkercat.org\/remodel\/wp-json\/wp\/v2\/posts\/69","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/blog.parkercat.org\/remodel\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/blog.parkercat.org\/remodel\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/blog.parkercat.org\/remodel\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/blog.parkercat.org\/remodel\/wp-json\/wp\/v2\/comments?post=69"}],"version-history":[{"count":0,"href":"http:\/\/blog.parkercat.org\/remodel\/wp-json\/wp\/v2\/posts\/69\/revisions"}],"wp:attachment":[{"href":"http:\/\/blog.parkercat.org\/remodel\/wp-json\/wp\/v2\/media?parent=69"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/blog.parkercat.org\/remodel\/wp-json\/wp\/v2\/categories?post=69"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/blog.parkercat.org\/remodel\/wp-json\/wp\/v2\/tags?post=69"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}