Concept of a Window

Two window posts in a row! Such is progress in these things. This window in the Green Bathroom is moving to the right, but is delayed: the building inspector is requiring tempered glass so it had to be reordered. But we need to make progress. So the opening is rough framed to allow drywall to proceed. And the outside is being left alone for now because we’re having Second March here in April and it’s cold out.

Leave a Reply

Your email address will not be published. Required fields are marked *

*