Nice rack

Solar installation proceeds! Yesterday they installed the racking system and the receiver units for each panel. If you count you’ll see there are 24 spots. All that’s left is to install & connect the panels themselves (scheduled for Monday) — and then wait out the bureaucratic processes to allow us to turn the system on. When done it should produce 7200 kWh annually, enough to supply our entire house.

DCL_3557

Puddle

I walked to the train this morning due to puddles like this one: too wet for me for the bike, and I’m meeting Lis in town this evening so didn’t want to leave my car at the station. It took17 1/2 minutes, which is why I don’t do this more regularly.

image

Lift

OK, it’s not Throwback Thursday but I had to post this one.  This photo of a photo is me, at New England’s first chairlift, in about 1977. I am told that my grandfather (my mom’s dad) saved opening day one season by fixing the lift — he worked for Gates Rubber Company (which made industrial belts), and was able to repair the main drive.  Can anyone name the ski area? (I do know the answer).

DCL_3552

Training

I had day 1 of a 2-day training for work today. They gave us pipe cleaners (now called “chenille sticks” evidently) to play with to drain off some fidgety energy. Evidently they’ve dealt with engineers before.  I took full advantage.

2015-06-02 15.49.26

Waiting

Lis is flying back from Arizona today and I am meeting her at South Station so we can ride home together. Her flight is, of course, delayed so I had to find some way to pass the time.

wpid-img_20150601_180504861.jpg